PROJECT

2020

• FPSO FINE FILTER BACKWASH OVERBOARD LINE LEAKING
• FABRICATION & INSTALLATION OF STRIP PLATE ON EX-RUDDER OPENING
• PUMP ROOM MODIFICATION – ONSHORE
• FABRICATION AND OFFSHORE INSTALLATION
• FRESH WATER GENERATOR SEA WATER PIPING TO SURVEY, FABRICATION AND            INSTALLATION                                                                                                                             

• FABRICATION AND INSTALLATION OF RADIATOR  WATER INJECTION TURRET PIPING CHANGE OUT

• ANOMALIES PIPING AND VALVES INSTALLATION
• PROVISION OF REFURBISHMENT CRADLE
• SEAWATER TIE-IN FOR U-WILD – ER AIR COMPRESSOR
• TURRET DTU PIG RECEIVER FLARE PIPING CHANGE OUT
• SURVEY & REPLACE CORRODED CONDENSATE PIPING RETURN LINE
• COFFERDAM FABRICATION
• FPSO U-WILD CAMPAIGN
• PROVISION OF MANPOWER AND EQUIPMENT FOR HP GASCO PIPING CHEMICAL        PLAN
• LASER SCAN SURVEY ONBOARD FPSO
• PRODUCED WATER HYDRO CYCLONE PIPING CHANGE OUT

2019

• TANK FABRICATION
• HOOK-UP AND COMMISSIONING FOR AIR COMPRESSOR 20MT.
• PIPING FABRICATION AND INSTALLATION FOR CHEMICAL INJECTION OQ.                    
• FABRICATION 2X NEW SPOOLS FOR SNP WATER INJECTION.                               
• HOOK UP AND COMMISSIONING (HUC) FOR PLATFORM         

• FABRICATION 2X NEW SPOOLS FOR SNP W                                                           
• FABRICATE AND INSTALL OF MOISTURE DEVICE                                     
• PIPING MODIFICATION FOR CONDENSATE RECOVERY UNIT ONBOARD OF FPSO          • TEG PIPING MODIFICATION                   
• OFFSHORE EXCHANGER QUILL POINT REPAIR                                                     
• FABRICATE PIPE FOR COARSE FILTER BACKWASH                                         
• TEST SEPARATOR BRIDDLE MODIFICATION                                           
• TO SUPPLY, FABRICATE, DELIVER & OFFSHORE                                                   
• INSTALLATION FOR H5 & H4 ANOMALIES                       

2018

• OFFSHORE – DTU GASLIFT FPSO TOPSIDE MODIFICATION – RETROFIT / HOOKUP
  COMMISIONING.
• REFINARY – LIFTING EQUIPMENT INSPECTION AND SERVICES – 2 YEARS + 1  YEARS  CONTRACT.
• PROVISION OF BLASTING AND PAINTING FOR PRE-FABRICATED 16″ RISER FOR   PRODUCTION UNIT

 

• PROVISION OF BLASTING AND PAINTING REPAIR WORK FOR PLATFORM
• PROVISION OF MATERIAL AND FABRICATION OF WALKING PLATFORM FOR     REFINARY
• PROVISION SUPPLY OF MANPOWER, EQUIPMENT, TOOLS & CONSUMABLES TO
  REPLACE DBB WITH SPOOLS OFFSHORE
• PROVISION OF MANPOWER, EQUIPMENT, TOOLS AND CONSUMABLES FOR BOLT
  TENSIONING & TORQUEING FOR ZWATIKA DEVELOPMENT PHASE 1C PROJECT     MYAMAR
• MANPOWER, EQUIPMENT, TOOLS AND CONSUMABLES TO PERFORM FABRICATION    AND INSTALLATION OF HANDRAIL AT LIVING QUARTERS (LQ) AND LADDER     SECTIONS ONBOARD FPSO

2017

• FABRICATION OF MODULE 6 – GAS LINE PIPING FOR FPSO
• TAMBA BRAZIL – BC 10 ‘RIS’ PIPING – EXPORT TO BRAZIL.
• NUCLEONIC PROFILER INSTRUMENTATION AND HOOK-UP
• INSTALLATION SUPPORT FOR PORT STEAM TURBINE INSTALLATION WORK

• OFFSHORE NOISE CONSULTANCY PROJECT
• VALVE CHANGE OUT AT SWLP A DURING UWILD CAMPAIGN
• FABRICATION OF PIPE SPOOL FOR FPSO
• FABRICATION AND SUPPLY OF NEELAM HEERA SEPARATOR INTERNALS – EXPORT TO INDIA
• INSULATION AND DRY GAS SEALS FOR COMPRESSORS FPSO

2016

• FPSO SIDE SHELL PLATING REPLACEMENT.
• JETTY FENDER FABRICATION AND INSTALLATION.
• ALOP HOSE FABRICATION
• PPI FABRICATION AND INSTALLATION OFFSHORE
• FRP PLATFORM FABRICATION ONBOARD OF FPSO
• PPI FABRICATION AND INSTALLATION – OFFSHORE PLATFORM

• LOAD BEARING SCAFFOLDING CALCULATION AND ERECTION                                           
• FSO VOID TANK STEEL PLATE REPAIR AND REPLACEMENT                                   
• FABRICATION OF TRANSFER PLATFORM                                                    
• SCBA AND SAFETY DEVICED SERVING                                                        
• FSO DIESEL ENGINE OVERHAULING – YANMAR ENGINE                                         
• FPSO OFFSHORE TRANSFORMER REPLACEMENT